Most “broken” HVAC equipment is working exactly as it was told to. The instructions are the problem.

The Sequence of Operations Is the Real System

Every piece of commercial HVAC equipment runs according to a sequence of operations — a written description of what should happen at each condition. When a building runs hot, runs cold, or burns energy for no visible reason, the fault is frequently in that sequence, in a sensor feeding it bad data, or in someone’s well-meant override from three years ago that nobody documented.

A simultaneous heating-and-cooling condition, an economizer locked out on a mild day, a chiller that will not stage, a VAV box stuck at minimum — these look like equipment failures on a work order. They are control failures, and replacing hardware does not fix them.

Controls work is diagnostic work. It starts with reading the sequence, trending the points, and comparing what the system believes against what a calibrated instrument actually measures at the equipment.

Controls Services

Sequence of Operations Review

We read what the system is supposed to do, then verify what it actually does. Undocumented overrides and hand-off points are found here.

Sensor Calibration

A BAS is only as honest as its sensors. Space, duct, water, and outside-air sensors verified against calibrated instruments — drifted sensors quietly corrupt every decision downstream.

BACnet & Modbus Devices

Controller, field device, and network troubleshooting on open protocols, including devices from mixed vendors that no longer talk to each other.

Trend Logging & Analysis

Trends turn an intermittent complaint into a diagnosable pattern. We set up logging and read it, rather than chasing a symptom that only appears on Tuesdays.

Setpoint & Reset Strategy

Supply air reset, chilled/condenser water reset, static pressure reset, and economizer changeover — the cheapest efficiency work available in most buildings.

Alarm Rationalization

A front end throwing 400 nuisance alarms is a front end nobody reads. We prune, prioritize, and make the alarms mean something again.

What a Controls Review Typically Finds

Simultaneous heating and cooling — reheat fighting cooling in the same zone, one of the most expensive and most common findings in commercial buildings.
Economizers disabled, seized, or with a changeover setpoint that never lets free cooling run.
Space and outside-air temperature sensors reading several degrees off, causing every downstream decision to be made on bad data.
Permanent manual overrides left in place after a long-forgotten service call.
Static pressure or supply air setpoints fixed at design values instead of reset, forcing fans and chillers to run harder than the load requires.
Schedules that never actually put the building into unoccupied mode, so equipment runs all night.
ASHRAE/ACCA/ANSI Standard 180 treats control verification as part of commercial HVAC maintenance — not an optional extra.

Fighting Your Building Automation System?